Electrical Load Schedule

Electrical Load Schedule

How important is the electrical plan in terms of load schedule​.

Daftar Isi

1. How important is the electrical plan in terms of load schedule​.


Answer:

Preparing a load schedule helps in determining the amount of power required for an installation. The load schedule helps electrical engineers to properly size conductors, conduits and protection systems. In addition, it helps designers to properly size the power backup generators or other alternative power sources.

2. how important is the electrical plans in terms of load schedule?​


Answer:

Preparing a load schedule helps in determining the amount of power required for an installation. This information is then used by electrical engineers to properly size conductors, conduits and determine the proper overload and other protection and control systems.

Explanation:

(base on my search)


3. 1. It is electrical current such as AC or DC.A. Wiring B. Load C. Source D. Battery2. It is an appliance, light bulbs, gadgets that make use of electrical currentA Load B. Current C. Source D. Power3. A device used to cut the flow of electric current.A. Receptacle B. Switch C. Breaker D. Socket4. A conductor or cupper wire where electric current passesA. Wiring plan B. Electrical wire C. Electrical equipment D. Current5. Drawing or representation of electrical system proposed to be installed in a building or house.A Drawing B. House plan C. Electrical plan D. electrical symbols6. A plan of room or floor of building drawn to scale as if viewed from above.A, LegendB. Load schedule C. Floor Plan D. Drawing7. It shows details can be seen the schedule of loadA. Load schedule B. Riser diagram C. Title Block D. Legend8. It shows the meaning of each symbol used in the electrical plan.A. Load schedule B. Riser diagram C. Title BlockD. Legend9. It indicates the following details, like name, location, address, printedname of the owner etc.A. Load schedule B. Riser diagram C. Title Block D. Legend10. It shows a single line diagram presentation of the entire electricalcircuit form the service entrance up to the smallest circuit branchA. Load schedule B. Riser diagram C. Title Block D. Legend​


Answer:

1. Answer : A. Wiring / #A.

2. Answer : D. Power / #D.

3. Answer : B. Switch / #B.

4. Answer : B. Electric Wire / #B.

5. Answer : D. Electric Plans / #D.

6. Answer : D. Drawing / #D.

7. Answer : A. Load Schedule / #A.

8. Answer : C. Title Block / #C.

9. Answer : B. Riser Diagram / #B.

10. Answer : D. Legend / #D.

ADVICE :

Pls dont just copy my answer check it first before you copy the reason is it might be wrong and some of it is correct so while its early check it If im wrong correct me. Thank you for listening my Advice.

HASHTAGS

#Keeponlearning

#Carryonlearning

#ScienceSubject

#ANSWERED

Answer:

1.A

2.D

3.b

4.b

5.d

6.d

7.a

8.c

9.b

10.d


4. Directions: Write T if the underline word/s in the statement is true and F if false. Write your answer on the space provided before the number. 1. Title block or name plate is located at the lower portion of an Electrical Wiring Plan. 2. The floor plan is the sketch that shows the side view of the house, building or other related structure. 3. The schedule of load shows the location of lighting and appliance loads. 4. The Riser Diagram shows a line diagram of the main disconnecting means, electric service meter and service entrance. 5. Electrical specifications shows the guidelines that the electrician's must follow in performing electrical work​


Answer:
1.) TRUE
2.) TRUE
3.) TRUE
4.) TRUE
5.) TRUE

sana maka-tulong^^

Stay Safe!


5. 1. Which of the following best describes a best G.I. pipe schedule for horizontalposition?a. Scheduled 20b. Scheduled 40c. Scheduled 30d. Scheduled 10​


Answer:

A scheduled 20

Explanation:

The higher the schedule the thicker the pipe wall

Example schedule 20,40 and 80


6. It is a type of schedule and mind map created for a person who has the role and responsiodity to dean À Cleaning schedule C. marketing schedule B. bathing schedule D. cooking schedule​


Answer:

C marketing schedule

There

Answer:

A cleaning schedule

Sana maka tulong


7. 1. It is an electrical layout that shows the location of outlets, equipment and/or apparatus and controls, D. plan for fire alarm A. plan for lighting B. floor plan C. plan for power 2. It is an electrical layout that shows the location of switches for each fixtures or group of fixtures, D. plan for lighting A. Floor plan B. plan for power C. plan for fire alarm 3. It is an electrical plan content that shows the summary of data to easily identify and facilitate the necessary values and equipment rating to be used in any electrical installation. A. plan for power D. schedule of load B. plan for lighting C. power plan 4. It is an electrical layout that shows the sizes and location of service entrance conductors, raceways, metering equipment, main switchboard, layout of feeders and distribution panels. A. floor plan B. plan for lighting C. site plan D. plan for power 5. It is an electrical plan content showing the location of equipment and devices. A. plan for power B. general notes C. site plan D. floor plan 6. It is an electrical plan content that shows the nature of electrical service, including number of phases, number of wires, voltage and frequency. A legend B. schedule of load C. site plan D. general notes 7. It is an electrical plan content that shows the electrical symbols and its name used in the electrical plan based on the job requirement. A. schedule of load B. general notes C. site plan D. legend 8. What electrical plan content that shows the clearance of the path or run of service drops and entrance w to adjacent existing and/or proposed structures. A. legend B. general notes C. electrical layout D. site plan 9. This describes the position of all the electrical apparatus A. plan B. building plan C. civil tech plan D. electrical plan 10. It shows all the details of resources and timings to accomplish an objective. A. technical plan B. electrical plan C. civil tech plan D. plan​


1. C.

2. B.

3. A.

4. B.

5. C.

6. A.

7. B.

8. C.

9. D.

10. A.

sana makatulong


8. 5. What is the part of wiring plan which shows the number of branch ofelectrical circuit?A. general notesC. raiser diagramB. load scheduleD. title block​


Answer:

B. load schedule

Explanation:

hope it's help

<<<BlackMajasty>>>


9. Zamboanga electric cooperative has this rate schedule for heating a single family house ​


Answer:

Monthly service charge P128 first 50 terms P.75 per them Over 50 terms P.45 per therm


10. Performance Task No. 3.7Directions: On your own understanding, answer the following question and explain each atleast 3 to 5 sentences. Write your answer in one whole intermediate pad.1. What is the difference between vicinity map and location map?2. Why do you think it is important to consider the size of wire and overprotective device inan electrical wiring?3. How important do you think Load schedule in an electrical plan?patulong naman please​


Answer:

1.As nouns the difference between vicinity and location

is that vicinity is proximity, or the state of being near while location is a particular point or place in physical space.

2.When choosing the right size of the wire, you must consider the gauge of the wire, the wire capacity, and what the wire will be used for.

3.A load schedule can assist in determining the amount of power required for a particular installation. Electrical engineers can use the load schedule to size conductors, conduits, and protection systems correctly. It also aids designers in correctly sizing backup generators or other alternate power sources.


11. Schedule system faculty loads introduction


Answer:

The Faculty Load System provides the ability to analyze and report faculty loads against contract requirements. Faculty loads are defined in terms of Equated Load Units (ELUs) which are the "units" faculty earn for teaching courses and for performing non-instructional activities such as department chair and research.

Faculty loads can consist of instructional assignments, non-instructional assignments or a combination of both. Instructional assignments are entered by department schedulers using the Department Class Schedule System.  Non-instructional assignments and other faculty load-related data, such as permanent load overrides, are entered by the office of Curricular Management using data provided by the departments.

The key report, the Faculty Load Analysis Report, is comprised of a set of complementary reports, any combination of which can be selected and produced for an academic year at the university, college, department or individual level.

Explanation:


12. I KnowDirections: Write T if the statement is true and F if false. Then, if false change underlined wordwith comect word to make the statement True.Write your answer on the space provided before the number,T1. Title block or name plate is located at the upper portion of an ElectricalWiring Planor other2. The floor plan is the sketch that shows the top view of the house, buildingrelated structure.3. The schedule of load shows the comprehensive computation of lighting and applianceloads.4. The legend shows a line diagram of the main disconnecting means, electric servicemeter and service entrance.follow in5. Electrical specifications show the guidelines that the electrician's mustperforming electrical work​


Answer:

1.true

2.true

3.true

4.true

5.true

Explanation:

Mark me as brainlest answer

13. Describe forward scheduling and backward scheduling.? ​


FORWARD AND BACKWARD SCHEDULING DEFINITION  

Answer:

What is forward scheduling and backward scheduling meaning? Forward scheduling fuses choosing an arranged request delivery date and planning of ensuing exercises from there on. In backward scheduling framework, you should start with an arranged receipt date or due date, the date regularly given by client.

In backward scheduling is arranging with the essential goal of finishing responsibilities exactly on schedule. In backward scheduling it is smoothed out for flexibility and grants associations to conveniently solidify last-minute changes or customizations

In forward scheduling, it is arranging with the essential goal of doing a job straightaway, with a lot of lead time.

FORWARD AND BACKWARD SCHEDULING DEFINITION//brainly.ph/question/13216490

#LETSSTUDY


14. It is a part of electrical wiring plan which shows specification of branch circuits such as size of wire, circuit protection rating, size of conduit.A. Legend C. Location mapB. Load schedule D. Title block​


B. Location Schedule

Location Schedule. It is a part of electrical wiring plan which shows specification of branch circuits such as size of wire, circuit protection rating, size of conduit.


15. your teacher posted a schedule for your online kamustahan what your mother told you that she does not have enough load for you to join your online class what is your possible solution​


It's better if you connect to someone's phone to join the online kamustahan or borrow some money to buy load. But in the other case, if you don't find any possible solution, it's better if you just let your adviser know about your situation.

HOPE IT HELPS

#CARRY ON LEARNING.


16. It show details can be seen the schedule of load​


Answer:

grabe ang hirap pala sorry di ko kayang sagutan


17. Initial/Starting Reading:Time Schedule in Reading:DayActivities done usingelectricityMeter readingElectricity un123456que7Total electricity used:Steps:1. Using the table above, fill in the columns daily.2. Set a time for a day to visit, read and record your electric meter. You must seto it that your scheduled time must he consistantSad​


Answer:

hfonhxnfhupg

Step-by-step explanation:

fuxjjinfj


18. 11. What will you do if the load schedule reflects a 20AT/2.0 sq.m over rated?​


Answer:

Computations

Circuit 1:

I = 1,200 VA/ 220 V = 5.45 Ampere

Wire = 5.45 / 80% = 6.82 Amperes , Use 2.0 sqmm TW wire or #14 AWG [1]

Circuit Breaker = Use 15 A Circuit Breaker

Conduit = Use 1/2" diameter PVC conduit.

Explanation:

Schedule of load preparation is essential and a basic calculation for electrical engineers. In this process the proper sizing of conductors, overload protection and conduits are determined.

While there are different methods doing an electrical design but there is only one thing that cannot be altered --- code requirements must be followed.


19. choices:• legend• title block.•riser diagram• floor plan• location map• load schedule• specification​


Answer:

1. floor plan

2. load schedule

3. specification

4. legend

5. riser diagram

6. location map

7. ?

8. title block

Explanation:

sana nakatulong ako ^_^


20. Level 1. LOADLoad to complete! Here we go! Your teacher comes to visit you. since it is a scheduled visit your guardian or parent is present with you write your name in the oblong and your parents named in the rectangle complete the conversation by filling in the blanks with the missing words phrases the choices are given in the box ​


Answer:

1.) c'mon

2.) can

3.) we'll

4.) sorry

5.) I'm

6.)may

7.) can

8.) if

9.) do

10.) Thank you

#CarryOnLearning


21. 13. A delivery truck loaded 6 756.34 kg of rice in a schedule. If 2 136.12 kg was deliveredin a sari sari store, how many kilograms of rice are still in the delivery truck?A. 420.12B. 4620.22C. 4202.12.D. 45.60​


Answer:

B po

Step-by-step explanation:

6 756.34-2 136.12=4620.22


22. 6. The following details can be seen in the schedule of load EXCEPT. A. Name and location of the propose installation. B. Total current load per circuit and size of wire used. C. Number of branch circuit of electrical wiring system. D. Number of light outlet, power outlet and switches per branch.​


Answer:

b po sir

Explanation:

cuz I'm genius


23. What part of the electrical plan locates the total wattage ratting and of the load per circuit branch? A. LegendsB. Load ScheduleC. LocationD. Riser Diagram​


Answer:

b

Explanation:

Schedule of loads are just a summary of data to easily identify and facilitate the necessary values and equipment rating to be used in any electrical installation. Any data given in the schedule of loads were backed by calculation based on a well settled electrical principles and code requirements


24. What is the importance of production schedule or scheduling?​


Answer:

The purpose of production scheduling is to make your manufacturing process flow with maximum efficiency, by balancing your production needs with your available resources in the most cost-effective manner. It is making sure your orders are fulfilled in the most efficient way, without interruptions, delay, or stress.


25. 1. It shows a line diagram of the main disconnecting means, electric service meter and service entrance.a. Riser Diagramb. Specificationsc. Service Entranced. Schedule of Load


Answer:

A. or B. Basta Yan

Explanation:

Electrical disconnects are switches that isolate all wiring in a home or other building from the source of power, typically the utility power service. Also called the service disconnect, this is the first disconnect device after the utility meter.


26. what is the purpose of a load schedule​


Explanation:

Preparing a load schedule helps in determining the amount of power required for an installation. This information is then used by electrical engineers to properly size conductors, conduits and determine the proper overload and other protection and control systems.


27. Activity 1. Direction: Multiple Choices-Read carefully the statement and choose the word of the correct answer. Write your answer in the blank space provided. What is the meaning of acronym NEC, that serve as guide for the standard procedure in electrical wiring National Dectronic Company National Engineering Commission National Electrical Code National Electronic Course 2. It gives the general details of works to be done, which is based on the latest rules Specifications Schedule of load Celling plan electrical layout In what year of the edition of Philippine Electrical Code published 2961 B. 1981 4 is the summarization of computation in electrical loads and the number of convenience outlet Specifications Schedule of load Celling plan electrical layout Legend 5. It refers to the wine instalations that supply current to fight and convenient out? Conductor & Creut What diagram that ilustrates a physical layout of electrical distribution in a multilevel building using a single Floor plan electrical layout Specifications 7. It is an object accepted Celing plan electrical layout to typify or represent an electrical device, equipment, or material Power supply & Dectrical symbols Schedule of load Calling plan electrical layout Troubleshooting Wiring Fiser diagram shows the details of the electrical plan by Specifications in what year of the 2 edition of Philippine Electical Code published? b. 1969 10. What document in electrical installation must be posted or kapt at the job site und final inspection and Electrical Farmit Dectrical inspection Form Activity 2. Certificate of Completion Permit for Service Connection​


Answer:

1. National Electrical Code (NEC)

2. Panel board detail

3. 16th Nov. 1881

4. peak demand

5. photovoltaics

6. Schematics Circuit Diagram

7. electrical symbol

Explanation:

kindly mark as "thankyou" and rate 5

#CarryOnLearning

#CarryOnLearning#BrainliestAnswer


28. 1. Which of the following is shows the name and location of the proposedwiring installation?A. general notesC. raiser diagramB. load scheduleD. title block​


D.TITLE BLOCK

HOPE IT HELPS YOU

BRAINLIEST ME PLEASE 0U0

#CARRYONLEARNING


29. Learning Task 5 Directions: Identify the following statement in loading and unloading procedures according to workplace. Write A if it is the factors to be considered in the selection of loading and unloading procedures and write B if basic principles and procedures for loading and unloading. Write your answers on a separate paper. 1. Characteristics of raw materials 2. Quantity of raw materials/products 3. lay-out of Food (Fish) Processing Plant 4. Loading should be done automatically 5. Distance from loading and unloading area 6. Plan for preventive maintenance and schedule. 7. Determine the importance of raw materials/products/supplies. 8. Increase the size. quantity, weights of the materials to be loaded/unloaded when possible. 9. Simplify-reduce eliminate, or combine steps in loading/unloading of raw materials/products/supplies. 10. Utilize space-the more organized the procedure for loading/unloading, the less space will be needed.Pls answer this ​


Answer:

1)A

2)A

3)B

4)A

5)A

7)B

9)A

10)A

Explanation:

brainlest pls.


30. Based on your own opinion, what is the importance of having a calculation of schedule load in your lighting power and special purpose outlet. ​.


Answer:

yes I am I am I am I am not I can do it you can do that is a great time I am not